Faith Forge LabsPeru

Three quiet months are not the same as a quiet quarter

A service allowance can look sufficient when demand is added over a long period. The actual contract may apply the allowance separately to each month and expire anything unused.

This fictional comparison concerns document-capture processing. The provider plans, prices and demand are invented and explicitly assumed for the exercise. The point is to read the unit and period of the entitlement before treating unused capacity as money available elsewhere.

Read the period rule first

The organisation approves a three-month pilot with 60 pages in January, 140 in February and 60 in March. The work is assigned to those months because that is when the relevant material will be reviewed; moving it to another period would change the operating plan.

Plan A costs 20 planning units per month and includes 100 processed pages in that month. Unused credits expire at month end. Additional pages cost 0.5 units each. Plan B costs 35 units per month and includes 200 pages, with the same expiry rule. These are fictional monetary units, not a quote in PEN or another currency.

The inspected assumed contract counts each processed page once for this bounded pilot. There are no retries, failed-processing charges or additional features in the calculation. Those would require separate terms and estimates in a real procurement decision.

The initial proposal adds 60, 140 and 60 to get 260 pages, compares that with three allowances of 100 and predicts no additional charge. The arithmetic sum is right; the entitlement model is wrong.

Allocate the work to its actual month

Month Approved pages Plan A included pages used Plan A excess Plan A cost
January 60 60 0 20
February 140 100 40 40
March 60 60 0 20

January’s 40 unused credits expire. They do not pay for February’s 40 excess pages. February costs the monthly 20 plus 40 times 0.5: another 20. March’s unused capacity cannot retrospectively erase that charge either.

Plan A therefore costs 80 units over the pilot, rather than the 60 originally proposed. Plan B costs 105 units, with no excess at the stated demand. Both can handle the approved work under their assumed terms, but they do so at different costs.

The comparison leaves the monthly records visible. A single quarterly “credits remaining” figure would suggest an entitlement the provider has not supplied.

Complete the owner’s decision

The owner selects Plan A for this fixed pilot and approves the expected February excess. The decision is based on the bounded demand and assumed terms, not a general preference for the smaller plan.

The operating sheet records the page allocation, monthly allowance and expected charge. The team reviews actual processing against the appropriate month. It does not delay a required review solely to consume expiring credits unless the business separately approves that schedule change.

There is a clear revisit point. If February’s approved demand rises to 200 pages, Plan A would cost 20 plus 100 times 0.5: 70 units for that month. The three-month total would then be 110, above Plan B’s 105 under the unchanged comparison assumptions. A revised demand plan needs a revised decision; the original approval does not silently expand.

That threshold example is not a forecast. It shows which assumption makes the selected option appropriate and when another comparison becomes necessary.

Check the ledger with a small fixture

The isolated planning record allocates a synthetic January batch of 60 pages to January and a February batch of 140 to February. Its displayed February excess is 40, even though the quarter remains below 300 pages.

A March batch of 60 leaves 40 unused March credits, which are marked as expiring rather than carried forward. A separate nonprocessing document-editing task consumes no capture credits under the assumed contract. That control prevents the model from charging every administrative action as a processed page.

The fixture does not contact a provider or incur a charge. It tests the planning interpretation against the stated terms. The real account’s billing period, timezone, taxes, failed work, overage permission and plan-change conditions must be confirmed before operational approval.

Include the cost of maintaining the decision

Someone needs to own the demand estimate and inspect material changes. Source preparation, review and staff effort also have costs that this page-credit comparison does not measure. The selected plan is one part of an operating budget, not the entire price of the workflow.

The useful outcome is a completed, inspectable choice: Plan A with a known February excess and an explicit trigger for reassessment. Discuss these recurring responsibilities alongside the build on the scope and cost page.